Dholera Allotment Rankings
Edition2026-Q3 Last verified04 AUG 2026

Latest dated allotments

The only two allotments in Dholera SIR that carry a date on the public record, newest first, and the ten parcels whose documents never state one.

No paid placement · No developer money · Nothing for sale

The answer, first

The most recent dated land allotment in Dholera Special Investment Region went to M/s Seksaria Buildcon LLP, in joint venture with The Amore Banquet, by Letter of Award dated 24 December 2024, per the DICDL Annual Report 2024-25. Only two of twelve parcels carry a date. Last verified 4 August 2026.

Swipe columns

Dholera SIR land allotments ranked by the allotment date their source prints, newest first. The ten parcels with no stated date are listed below and marked UNKNOWN
Evidence
1Seksaria Buildcon and The Amore Banquet24 December 2024Letter of Award issuedcorporate 3-Star Hotel projectawarded through E-AuctionDICDL Annual Report 2024-25p.29Ref P12 · Verified 04 AUG 2026
2GAP Associates14 November 2024Letter of Award issuedResidential & Commercial Mixed-Use Developmentawarded through E-AuctionDICDL Annual Report 2024-25p.28Ref P11 · Verified 04 AUG 2026
Cannot
rank
Tata Semiconductor SEZ footprintUNKNOWNNOT STATEDUNKNOWNUNKNOWNGazette of India, S.O. 1853(E)p.3Ref P01 · Verified 04 AUG 2026
Cannot
rank
Tata SemiconductorUNKNOWNNOT STATEDUNKNOWNUNKNOWNDICDL Annual Report 2024-25p.20Ref P02 · Verified 04 AUG 2026
Cannot
rank
Renew PhotovoltaicsUNKNOWNNOT STATEDUNKNOWNUNKNOWNDICDL Annual Report 2024-25p.20Ref P03 · Verified 04 AUG 2026
Cannot
rank
Polycab IndiaUNKNOWNNOT STATEDUNKNOWNUNKNOWNDICDL Annual Report 2024-25p.20Ref P04 · Verified 04 AUG 2026
Cannot
rank
Inox Air ProductsUNKNOWNNOT STATEDUNKNOWNUNKNOWNDICDL Annual Report 2024-25p.20Ref P05 · Verified 04 AUG 2026
Cannot
rank
Unnamed other proponentsUNKNOWNNOT STATEDUNKNOWNUNKNOWNDICDL Annual Report 2024-25p.20Ref P06 · Verified 04 AUG 2026
Cannot
rank
DSIRDA equity land transferUNKNOWNNOT STATEDUNKNOWNAllotted by DSIRDA to DICDL as contribution to equity share capitalDICDL Annual Report 2024-25p.71Ref P07 · Verified 04 AUG 2026
Cannot
rank
DICDL Activation Area holdingUNKNOWNNOT STATEDUNKNOWNOwned by DICDL; stated as 'would be transferred on lease hold basis'DICDL Annual Report 2024-25p.71Ref P08 · Verified 04 AUG 2026
Cannot
rank
Road land lease backUNKNOWNNOT STATEDUNKNOWNlease (transferred back to DSIRDA, then leased back to DICDL)DICDL Annual Report 2024-25p.111Ref P09 · Verified 04 AUG 2026
Cannot
rank
Common cleanroom facility siteUNKNOWNNOT STATEDUNKNOWNTo be developed on PPP basis; concession partner not yet selectedDICDL Cleanroom RfQ cum RfPp.138Ref P10 · Verified 04 AUG 2026
12 rows. Source: DICDL Annual Report 2024-25 and the other five source documents. Retrieved and last verified: 4 August 2026. Download this view as CSV. Whole dataset.

How this list is ordered, and what would move a rank

The rule. Parcels are ordered by the allotment date printed in their source, newest first, and only a date a document actually states counts. A value date, a balance sheet date and a gazette date are not allotment dates and none of them is used here, which is why ten of the twelve parcels cannot rank even though every one of them carries a date of some other kind.

What the two dates are. Both are the date a Letter of Award was issued, which is what the annual report says and all it says. Neither record states when a lease deed was executed, what area was awarded, or what was paid for the land.

What would move a rank. A third dated award, which would slot in by date alone. Or a lease execution date for either of the two here, which would not change this ranking but would let a second, sharper date column exist for the first time.

Who is not on this list, and on which criterion

Ten parcels cannot rank on this list, on one criterion: no document in this source set states an allotment date for them. That covers the Tata Semiconductor footprint, the three other companies named in the Board’s Report, the DSIRDA equity land, the Activation Area holding, the road land lease back, the unnamed proponents and the planned cleanroom site. The gazette notification that defines the 66.166 hectare Tata footprint is an SEZ notification rather than an allotment deed, and it is silent on date, tenure and consideration alike.

A project investment figure is not a land price

Two money figures sit beside these awards in the annual report: approximately Rs 2,000 crore against the GAP Associates award and approximately Rs 35 crore against the Seksaria Buildcon award. Both are stated total project investment, which is what the developer says it intends to spend on the whole scheme. Neither is the price paid for the land, neither is a consideration, and this register never ranks anything by them. The dataset carries an explicit warning field against both figures for that reason.

Status: OFFICIAL. Source: DICDL Annual Report 2024-25, PDF pages 28 and 29. Record speaks as of 31 March 2025. Last verified 4 August 2026.

This list exists because of a correction

An earlier pass on this dataset asserted that no allotment date existed anywhere in the sources. Adversarial verification found two dated Letters of Award on pages 28 and 29 of the annual report, and both records were added on 4 August 2026. Before that correction this ranking would have been empty. The change log carries it in full, including what was wrong and how it was verified, because a register that only shows its current state is asking to be trusted.